The Bridge at Dozan, Bolan Pass, near Quetta, Pakistan

The Bridge at Dozan, Bolan Pass, near Quetta, Pakistan
The bridge carried both road and rail over a creek bed. The bed had to be dug out by hand over many days, with much help freely given by locals. Click on the photo and scroll down, to bring up the story of this bridge. Go to: http://www.highroadforoz.info/index.html to find more.

Friday, August 26, 2011

The Engine; Albion 6-cylinder diesel

In order for Albert to be mobile again, the engine was removed for overhaul and after re-installation, No. 2004 was to be independently mobile for the first time in 30 years.
The engine comes out for overhaul
The only Albion engine to have been from Britain to Australia five times. Paul Adams, Scottish owner of restored Sydney Albion no. 1877, watches
In every Albion diesel, the engine side plates and their bolts are rusted from the cooling water. Andy gets into some skilled fitting work drilling out the bolts and threading them for new bolts.
Friends, and Albion experts, John Rentoul and Derek remove pistons and connecting rods.
Cleaned, parts laid out, Derek, John and Davie make it look easy.
In the finest traditions of Scottish engineering: Peter Burt, John Rentoul and Derek Ferguson machine engine valves to a perfect finish
Reassembled: the engine is started for the first time in perhaps 20 years, in a cloud of smoke (and deafening noise?) from the exhaust . Note the makeshift oil gauge, battery leads to the starter, and a pipe at right to stop the engine itself spinning around! John Rentoul and Cliff Martin feel quiet pride.Up top, the valve gear clatters in a satisfying sort of way. John's hand is on the exhaust manifold so it can't have been running long!
The rebuilt engine and gearbox at rear is readied for installation. In a double decker you need lifting gear which can reach under the top deck overhang. The piece of orange tube along the bottom casing is where the dynamo should be: more of that later.
This mobility then allowed the rear end overhaul to begin, including a back platform, stairs, rear wheel arches and the rear chassis.

Independently mobile: the engine is back in, running, a lot of new bodywork has been done, but that roof, my dear!!.... Well it had to be made like that to fit under bridges in India, and is to be remade with Andy's skills having matured over the last 35 years!The engine refitted, running, and a temporary radiator from an Albion truck in place. Andy couldn't wait for the original to be finished off in Glasgow before he could take Albert for a run, however brief.


Paul Adams and Derk Ferguson in Glasgow this time, work on Albert's original bus radiator: different in some ways to the truck ones. At left to confuse the issue is another Albion, a truck, under restoration.
The original radiator, polished, and with new gaskets and rubbers throughout, fitted. All the Sydney Albions had a 'Venturer' badge once, but they were souvenired or just left off by staff, and to find one now has been lucky.

The dynamo presented a challenge as the original had been taken sometime during the 2002-2009 era. An original Chullora (NSW) dynamo was donated by friends of Albert, which resolved the problem. Shipping from Australia was a challenge but Roy Bartlett of Freightbiz, himself a Pom, gave us a pretty good deal on the 5okg. crate. Off it went by air, then, just when everything seemed to be going well, the dynamo was ‘hijacked’ by a handling agent wielding ‘red tape’ and imposing amazing import fees at Edinburgh Airport! A nice little earner for an unscrupulous Customs man, referring 'clients' (i.e. victims) to his mate. A direct appeal to a commonsense UK customs official finally saved the day. An original CAV 24 volt dynamo (generator) in amazing condition for its 50-odd years, gets a cleanup at Turramurra Works.
A thing of beauty (in the eyes of some beholders) is a joy forever: the rotating armature from the dynamo polished and ready to be assembled.


Wednesday, August 24, 2011

A Discovery: in 2001

Sadly, in 1976, with the Iranian Revolution creating serious safety hazards,the Asian Highway was closed and trip No. 16, destined for Sydney, Australia, was cancelled. The regular journeys had come to an end. Andy, not wanting to sell the bus, was as a result forced to find Albert a comfortable home. He left the bus with small yard preservationist at Canvey Island, Essex . . . a Mr. Cunningham.
Mr Cunningham, after some years, moved/sold the bus which re-appeared on a caravan site in Lincolnshire. Then a group of well-intentioned hippies took it to Chepstow, South Wales to use as a home, during the years 1984 to 2001.
Fast forward to January, 2001. Andy with the help of Paul Adams, another Albion owner and restorer, had traced Albert to Steyning, near Brighton in Sussex (England). An offer was made to buy back No. 2004 but, unfortunately, this was declined, with the owner wanting to preserve the bus for its historic value. It would be eight years before Andy heard of Albert again. With the restoration of Albert being difficult, the then-current owner re-contacted Andy, who, in December, 2009, bought the bus back. Andy knew Albert was up to the challenge of completing his 16th, and final, journey home to retire in Sydney, Australia. There was also no doubt, that Albert’s current condition, and the restoration required, was going to be a physical and mental journey all on its own! Notorious Scottish weather being what it is, ensured that a large part of the restoration had to take place under cover.

When given the chance, and a break in the weather, some of the restorations were moved outdoors. Some modifications were made to incorporate a removable floor, which, when removed, exposed the gearbox and chassis. This was deemed a necessity in case running repairs needed to be undertaken throughout the journey.

The old floor has been ripped out allowing access to the body cross members which rest on the (red) chassis Rusted sections are cut out and new pieces (home made) are welded in.
Friends Cliff, Davie and John get into it. Look at the rusty cross members (below)!


The furnishings now included a lounge and collapsible tables, with a kitchen in the middle of the bus that has a gas stove and storage for enough water to last a week.



Monday, August 22, 2011

The Epic Journeys 1968 to 1976

Sydney to Calcutta:
Albert left Australia on October 8th, 1968, and would take 132 days to deliver the fare paying passengers to their destination. This was to be the first of 15 journeys.
"As the GPO clock struck ten o'clock Albert began to move, bedecked with balloons and streamers. Half-way down George Street there was a distinct lack of power and the bus came to a stop . . ." and so began Albert's log to London!



Leaving George Street Sydney
With a top speed of only 50 kph round-the-clock driving was applied. After finding a low rail bridge at Narranderra, getting lost in SA's Riverland, traversing a bone shattering unsealed Eyre Highway and being shaken by an earthquake in Meredin, Albert finally arrived in Perth . . relatively unscathed . . 6 days later.



Along the Nullarbor: Trip no. 1
The next phase was to find a ship to take the bus to India. Despite earlier research the ship expected to be seen in Fremantle was not there, but others were. In the event it was one to Singapore, a scary floating transfer in a barge, then a second ship to India.


Albert's "crew" of 13 sailed aboard the good ship "Centaur", a wonderful 5 day line voyage from Fremantle to Singapore from a past era, then by "jungle train" through Malaysia to Bangkok, then by air to the "City of Joy", Calcutta."Home away from home" : the galley and forward lounge

Calcutta to Quetta
Once all were safely reunited in Calcutta Albert took to India's Grand Trunk road with the daily challenge of cyclists, ox carts, wandering cows, low bridges and dangerously overhanging trees, all demanding the driver's attention and care. Not surprisingly the journey was slow, but fascinating always.

 A routine soon set in to keep moving until late at night as best protection against intense curiosity from over friendly locals. Early every morning groups of villagers would be crouching roadside talking the name A-L-B-E-R-T and debating whether they were seeing a double or a triple decker bus.

 The next major obstacle was at Dozan in the Bolan Pass, Pakistan, along the route via Quetta into southern Iran, where it was necessary to dig out a dry riverbed plus a piece of the mountain, well assisted by railway workers and the local tourist and highway departments (see picture below - the railway crosses the parallel road via a bridge too low - out of picture).
Quetta to Istanbul
From Quetta a desolate Baluchistan led to the Iranian frontier at Zahedan then long dusty days over stoney desert to Esfahan and Tehran, our half-way point. Now mid-winter and cold . . the engine block froze up, but the lesson learned was invaluable - if it breaks - you fix it. Local tradesmen demonstrated skills long discarded in the west and a few days later Albert was rolling again.

Approaching Tabriz it was so cold the diesel froze. With a 44 gallon drum inside the bus and a fuel line via a window - the engine was kept running 24 hours a day. Entering Turkey the temperature fell even further (-27 C) followed by the vision of Horason bridge necessitating wheel removal and military assistance.
The Turkish military to the rescue
All help unhesitatingly given in the warmest and most friendly spirit (see below).

 Along the Black Sea coast a welcome thaw set in before climbing again to Ankara to join a modern highway and Turkish drivers, who apparently can see round corners. After 4 months of travel, Australia's Nullarbor heat, the tropics, crossing oceans, deserts and mountains, and then into the freezing zone of northern Iran and Turkey, the arrival into Istanbul was a real comfort, a place to prepare for the final leg to London . . .
In the mountains of Turkey: breakfast stop approaching the Black Sea
Istanbul to London
All past obstacles were there to be overcome, an accepted part of the challenge. Now safely in Europe - Albert having crossed the dividing Bosphorus waterway - the crew were looking forward to a smooth ride to the English Channel with, hopefully, some bonus wayside comforts to be included. But not so!


Snow was falling again as the bus departed for the Edirne border and travelling through Bulgaria, a country then closely allied to Cold War Russia, was like the weather, far from welcoming. As the highways became busier with frenzied European traffic Albert was beginning to feel a little bit slow and out of place.

 After Salzburg came the autobahns of Germany; it was late afternoon. The first overhead bridges strangely displayed clearance signs in feet and inches, in English, each just a few inches over Albert's height. Then, without warning - Bang! A long weary night followed stopping at every bridge across Germany.

 The ferryport at Zeebrugge arrived in a misty dawn but with some relief, crew confidence being that across the Channel double-decker bus height would no longer be a problem. Victoria Coach Station staff provided a great reception for the long distance arrival and agreed to make a bay available for Albert should there be a return service to Sydney. However that, friends, is another story too!
Victoria Coach Station, near Buckingham Palace London
A winter Monday: 17th February 1969, 132 days out of Sydney.

Slightly amazed driver, conductress and coach passengers meet the aliens!

The bus returned to Sydney in 1969, departing from Bay 1 at Victoria Coach Station as promised by the superintendent and taking the same route beneath the rail bridge at Dozan where the river-bed had been cleared in advance by the local highway authority after the annual spring water flows.
Dining lounge, downstairs front
In 1970 the third journey, Sydney to London, went via the Khyber Pass and Afghanistan to avoid the Bolan scenario yet again. The new route had only one height diversion (read the book!) and was much enjoyed by travellers as Afghanistan, a starkly beautiful country, was becoming a popular destination.
A year-round timetable was drawn up for a regular service between London and Bombay, being trip Nos 4, 5, 6, 7, 8 & 9, and then trip No 10 running right through to Sydney and Trip No 11 from Sydney back to London. Trip Nos 12, 13, 14 & 15 operated between London and Calcutta.
In 1976, with political tensions rising in Iran, trip No 16 was planned to return ALBERT back to Sydney for a well earned retirement. However, the pace of revolutionary fervour beat our schedule with travel through Iran being considered impractical, so Albert had to be rested in England.
Over the years ALBERT made more than 150 border crossings without ever being held up for serious scrutiny and not once was a bribe proffered to smooth the passage, this at a time when other vehicles were all too often seen marooned at check-posts with neither body panels nor owners.
The bus earned universal respect as a friendly ambassador for all those on board and was always welcomed and smiled upon by officials and the countless friends made along the way for whom the name A-L-B-E-R-T was one they could read, remember and say - in any language!

Saturday, August 20, 2011

Early Days: starting 1947

If you ordered an Albion bus from the factory in 1946, about six months later, this would arrive by ship in Sydney. You could have long ones or short ones. Sydney bought 143 long ones, to carry 74 passengers. Then a bus body design had to be chosen, and a bus body builder contracted to build the complete bus. Two companies, Clyde Engineering and Commonwealth Engineering, both of Granville NSW,  tendered prices for the job. Clyde got most of the work: Albert has a Clyde body, different in a few ways to the Commonwealth ones. (Easier to fix, too).
As they were completed, all the new Albions were sent to Manly Depot, which served all the routes running from the city northwards to the lovely beaches stretching from Manly to Palm Beach. The trip from Wynyard to Palm Beach took 1
1/2 hours, across the Harbour Bridge, through superb scenery to what was then a rural hamlet.

Albion no. 2036 at Palm Beach in 1954, about to leave for the City on route 190

Nearing the end of their lives as Sydney Buses, two Albions, (not Albert) seen descending The Spit Hill towards the northern suburbs of Palm Beach and Collaroy. The year is 1969: by 1970 they had all been taken out of service after 23 years' work.
Drivers were required by rule to descend this very steep hill in 2nd gear: the driver of no. 1899 (above) is clearly taking his chances in third gear. No. 1899 is also restored, owned by Robert Hood in Goulburn NSW. Click on any photo to enlarge it.

The run they were best remembered for: the 190.
The engine side cover on all the Albions was purposely left off: in Sydney's hot summer, climbing this hill with a full load of passengers and a following north-easterly breeze made for one very hot engine. Radiator boil-overs were common.
Both photos by John Ward 

A  one-hour DVD movie of a journey on this route by one of these buses, no. 2023, is available from Sydney Bus Museum, at www.busshop.net